Technical drawing of full setup

2023-09-15

  • Target ladder reproduced exactly.
  • S3 active area and thickness correct, PCB geometry estimated.
  • ELUM active area geometry correct.
  • FC and dE-E estimated.
  • The generic Si-array is just some cylinder of reasonable size.
  • CeBr3 sides are staggered, not up to date with current holder tech-drawing.
  • Detector bed wildly randomized.

Screenshot 2023-09-15 at 09.16.25.png, Proposal.FCStd

Proposal9.png, proposal9.pdf
Topic revision: r3 - 12 Oct 2023, HansToshihideTornqvist - This page was cached on 06 Apr 2025 - 07:54.

This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback